Process integration using pinch analysis provides facility and site planners, plant designers and process engineers with practical knowledge, skills and step-wise method for the integrated optimal planning, design and retrofit of processes, facilities and manufacturing sites to promote industrial symbiosis and achieve triple-bottom line benefits of minimised utilities (e.g. thermal energy), minimised costs (operating, maintenance and investment costs) and minimised wastes (CO2, gaseous emissions). This Thermal Energy Recovery Technologist (TERT) workshop covers our copyrighted and patented trade mark technologies on Process Integration Based On Pinch Analysis that delves deep into process operation covering furnaces,reactors, seperators, heaters, coolers and heat exchanger network retrofit.
For TERT Level 3 competency, participants are required to demonstrate they can apply the knowledge of TERT Level 1 and 2 to an industrial case study. They are required to complete an industrial case study assignment. In addition, they also need to take an examination to test their knowledge.